TY - JOUR TI -

Estimated aggregate cost of ownership of a data processing center

T2 - IS - KW - data processing center KW - regression model KW - construction KW - representativeness of the sample KW - cost structure KW - operating costs KW - capital costs AB - Lyubov A. Pirogova - Project manager LEAN, Lamoda CompanyAddress: 10, Letnikovskaya Street, Moscow, 115114, Russian FederationE-mail: lbaydalina@gmail.comVladimir I. Grekoul - Professor, Department of Information Systems and Digital Infrastructure Management, National Research University Higher School of EconomicsAddress: 20, Myasnitskaya Street, Moscow, 101000, Russian FederationE-mail: grekoul@hse.ru Boris Е. Poklonov - Associate Professor, Department of Information Systems and Digital Infrastructure Management, National Research University Higher School of EconomicsAddress: 20, Myasnitskaya Street, Moscow, 101000, Russian FederationE-mail: bpoklonov@hse.ru        Under current conditions, we see growth in demand for IT outsourcing services. This implies the activation of design and construction processes for data processing centers (DPC). Since a DPC is a complicated and expensive system, there arises the issue of justifying selection of the future project based on the estimated costs of designing and operating data processing centers.      This paper analyzes one of the possible complexes of measures to estimate costs for development and operation of data processing centers. The analysis identified main groups of capital cost in development of data processing centers which were not fully taken into account in assessments of the total volume of capital investments in previously proposed methods. The article proposes regression models to evaluate processing center construction projects based on two measures. We propose to estimate the capital cost as a function of the projected floor space of service platforms and projected number of server racks. On the basis of the models developed,  analysis of the construction sites of processing data centers was conducted. This showed the model’s suitability to real data. The main groups of operating costs for DPC maintenance were established, and a regression model of their evaluation was proposed. Based on the regression equation, we propose to calculate the processing center’s power consumption depending on the area of the service platform or the number of server racks. The operating cost of the data processing center is determined by the power value. Analysis of information on the operating cost of various data processing centers is in fairly good agreement with the calculations obtained on the basis of the model developed.      The proposed models make it possible to evaluate with reasonable accuracy the project characteristics of development and subsequent operation of a data processing center. AU - Lyubov Pirogova AU - Vladimir Grekul AU - Boris Poklonov UR - https://bijournal.hse.ru/en/2016--2 (36)/186020074.html PY - 2016 SP - 32-40 VL -